GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH FOR YOUR SAFETY: Do not store or use gasoline or other flammable vapours and liquids in t
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 7. SYSTEMS INCORPORATING 90O ELBOWS AND 180O ELBOWS The STW-JZ / IW Series radiant tube h
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 7 8. SUSPENSION SYSTEM FIGURE 3 MOUNTING BOTH PLATE HANGER TYPES Intermediate We
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 8 FIGURE 6 PLATE HANGER/ELBOW INSTALLATION FIGURE 4 TYPICAL HANGER & SUPPORT
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH FIGURE 7 HANGER / REFLECTOR ORIENTATION HORIZONTAL TO 450 FIGURE 8 SUGGESTED MOUNTING
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH PRIOR TO PROCEEDING with the tube installation: Refer to section “8. System Suspension” I
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 11 FIGURE 10 BOLTING BURNER TO FLANGED TUBE • Align the four bolts through the flang
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH TABLE 4 TURBULATORS MODEL TURBULATOR LENGTH (IF REQUIRED) STW-JZ / IW-200-70/60/50 10’
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH FIGURE 13 MOUNTING FOCUS SHIELD REFLECTOR TO PLATE HANGER Page 13 10. FOCUS SHIELD REFLEC
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 13 Page 14 FIGURE 15 HANGER ARRANGEMENTS 1 1 NOTE: Except for the vent end plate hang
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH FIGURE 16 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) • Using “S” Hooks attach t
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Schwank Inc. 5285 Bradco Boulevard Mississauga, Ontario, L4W 2A6 Phone: (905) 712-4766 Fax:
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 11. FLUE VENTING INDIRECT VENTED APPLICATION DIRECT VENTED APPLICATION A length of ‘C’ Vent
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH The total maximum allowable combined length of vent and combustion air duct is 80' for
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 12. COMBUSTION AIR DUCT Where heater is operated in a negative air condi-tion or in contami
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 19 Do not install filters on the combustion air intake. For ease of installation, this
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH DO NOT use pressures greater than 1/2 psig. to pressure check the heater. TEST FOR LEAKS:
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 14. HEATER EXPANSION Page 21 The Btu/hr input and the tube length determine the overall exp
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH IMPORTANT: Do not install the thermostat or sensors in the direct radiant stream. 1
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 17. LIGHTING INSTRUCTIONS Refer to the lighting instructions on the out-side cover of the b
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH The STW-JZ / IW Burner with direct spark ignition, sequence is as follows : 19. SEQUENCE O
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 20. WIRING DIAGRAM WITH 120 VOLT THERMOSTAT OPERATION CARWASH STW-JZ / IW Page 25 THERMOSTA
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH STW-JZ / IW HARSH ENVIRONMENT INFRA-RED GAS TUBE HEATERS TOPIC
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH ON 24V OPTION ONLY: THE SWITCHING RELAY ENERGIZES, SENDING 115 VOLTS TO THE BLOWER 21. TR
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH MAIN BURNER LIGHTS SPARK STOPS WHEN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS C
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 22. WIRING DIAGRAM WITH FIELD INSTALLED 24 VOLT OPTION Page 28 THERMOSTAT OPTIONS: 120V TH
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 23. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides spark i
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 24. START-UP SHEET Page 30 COMMISSIONING REPORT CO
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 31 TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 25. OPTIONAL COMPONENTS: FOR STW-JZ / IW SERIES TUBE HEATERS Flue Vent Terminals 4” wal
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 33 90 degree Aluminized Steel Elbow Kit* *Kit includes: elbow, coupler, reflector an
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH JS-0569-XX JS-0568-KT JM-0303 –KT Low Voltage Thermos
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Hanging Chain - (box of 50ft) JL-0798-XX JA-0587-XX J
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH MODEL NO STD ORIFICE (DMS) FOR USE AT ALTITUDES ABOVE (FEET) 2000 3000 4000 5000 6000
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Some Authorities do not allow certain warranty exclusions or limitations on how long a warr
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH Page 1 GAS INFRA-RED TUBE HEATER STW-JZ / IW SERIES INSTALLATION INSTRUCTIONS 1. GENERAL I
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH The following tube lengths and corresponding BTU/hr input ratings are available: TABLE 1
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH 4. BURNER & TUBE KIT ASSEMBLY CHARTS Page 3 NOTE: STW-JZ / IW Series Burners require
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH MODEL MOUNTING HEIGHTS (FEET) MAXIMUM DISTANCE BETWEEN HEATERS (FEET) DISTANCE – OUTSIDE
GP-MSJW-CX-07B STW-JZ / IW Manual RD: Sept, 2005 RL: 7B KH FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBLES TABLE 3 MINIMUM CLEARANCES TO COMBUSTIBLES
Commenti su questo manuale