SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA INSTALLATION / OWNER’S MANUAL SCHWANK GAS FIRED STR - JZ SERIES LOW INTENSITY, TUBE-TYPE I
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 6 FIGURE 6 PLATE HANGER/ELBOW INSTALLATION FIGURE 4 TYPICAL HANGER & SUPPORT SPACIN
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA FIGURE 7 HANGER / REFLECTOR ORIENTATION HORIZONTAL TO 450 FIGURE 8 SUGGESTED MOUNTING HARDWA
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA PRIOR TO PROCEEDING with the tube installation: Refer to section “8. System Suspension” IF a 90°
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA · Align the four bolts through the flange adapter on tube flange, secure tightly with lock washers
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 10 TABLE 4 MODEL TURBULATOR LENGTH STR-JZ 60-30 14’ 0” STR-JZ 60-20 14’ 0” STR-JZ 45-20
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 8. FOCUS SHIELD REFLECTOR INSTALLATION The focus shield reflector system can be adjusted to eithe
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 12 FIGURE 12 HANGER ARRANGEMENTS 1 1 NOTE: Except for the vent end plate hanger, all hangers
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 13 FIGURE 13 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) Using “S” Hooks attach
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 14 9. FLUE VENTING THIS STR-JZ SERIES IS APPROVED FOR DIRECT VENTING APPLICATIONS. THE SYSTE
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 15 The heater is designed to operate with single wall 4” diameter 26 gauge minimum exhaust v
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA NOTICE: Schwank Inc. reserves the right to make changes to equipment and specifications without o
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 16 Where the vent pipe passes through areas where the ambient temperature is likely to produc
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 17 Do not install filters on the combustion air intake. For ease of installation, this heater
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA DO NOT use pressures greater than 1/2 psig. to pressure check the heater. TEST FOR LEAKS: All g
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 12. HEATER EXPANSION Page 19 Tube Length in Feet Btu/hr input rating Approximate Overall expansio
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 20 MODEL NO STD ORIFICE (DMS) FOR USE AT ALTITUDES ABOVE (FEET) 2000 3000 4000 5000 600
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 21 15. LIGHTING INSTRUCTIONS Refer to the lighting instructions on the outside cover of the b
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 22 The S87 is powered by a 25v transformer and activated when the thermostat calls for heat.
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 23 STR-JZ SERIES: WIRING DIAGRAM - HONEYWELL S87J1034 Caution: Label All Wires Prior To Di
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 24 18. STR-JZ SERIES: TROUBLESHOOTING GUIDE HONEYWELL S87J1034 120V THERMOSTAT APPLY
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 25 MAIN BURNER LIGHTS SPARK STOPS WHEN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA STR-JZ GARAGE & WORK SHOP INFRA-RED GAS TUBE HEATERS TABLE OF CONTENTS TOPIC
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 26 19. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides spark
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 21. START-UP SHEET Page 27 LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit i
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 28 COMMISSIONING REPORT CONTRACTOR NAME: ...
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 29 TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH AL
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 30 21. OPTIONAL COMPONENTS Flue Vent Terminals 4” wall horizontal 6” wall horizontal JA-05
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 31 90 degree Aluminized Steel Elbow Kit* *Kit includes: elbow, coupler, reflector and plate
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 32 #8 Hanging Chain - (box of 50 ft) JL-0798-JC Touch Up Paint - High Temp, 369g aerosol
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: STS-JZ / IQ, STV-
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA ! ! WARNING: a. Due to high temperatures, the appliance should be located out of traffic an
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 1 SCHWANK GAS INFRA-RED TUBE HEATER STR-JZ SERIES INSTALLATION INSTRUCTIONS Installation of t
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 2 3. PRE-INSTALLATION SURVEY The Schwank STR-JZ heating system must have gas piping
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 3 TABLE 2 MINIMUM CLEARANCES TO COMBUSTIBLES** MODEL SUSPENDED AT AN ANGLE UP TO 45 DEGREES
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA IMPORTANT: Continuous operation of single or multi-heater placement
SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 1) Survey the available structural supports, considering the system configuration and heat re-qui