INSTALLATION /
OWNER’S
MANUAL
SCHWANK GAS FIRED
STR - JZ
SERIES
LOW INTENSITY, TUBE-TYPE
INFRA RED HEATERS
Do not store or use gasoline or other flammable vapors
and liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not use any
phone in your building.
Immediately call your gas supplier from a neighbor's
phone. Follow the gas supplier’s instructions.
If you cannot reach your gas supplier, call the fire de-
partment.
Installation and service must be performed by a qualified
installer, service agency or the gas supplier
WARNING: If the information in these instructions are
not followed exactly, a fire or explosion may result
causing property damage, personal injury or loss of life.
INSTALLER: Leave this manual with the appliance.
CUSTOMER: Retain this manual for future reference.
Vedere la pagina 0
1 2 3 4 5 6 ... 36 37

Sommario

Pagina 1 - STR - JZ

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA INSTALLATION / OWNER’S MANUAL SCHWANK GAS FIRED STR - JZ SERIES LOW INTENSITY, TUBE-TYPE I

Pagina 2

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 6 FIGURE 6 PLATE HANGER/ELBOW INSTALLATION FIGURE 4 TYPICAL HANGER & SUPPORT SPACIN

Pagina 3 - TABLE OF CONTENTS

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA FIGURE 7 HANGER / REFLECTOR ORIENTATION HORIZONTAL TO 450 FIGURE 8 SUGGESTED MOUNTING HARDWA

Pagina 4 - WARNING:

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA PRIOR TO PROCEEDING with the tube installation: Refer to section “8. System Suspension” IF a 90°

Pagina 5 - INSTALLATION INSTRUCTIONS

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA · Align the four bolts through the flange adapter on tube flange, secure tightly with lock washers

Pagina 6 - MODEL:

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 10 TABLE 4 MODEL TURBULATOR LENGTH STR-JZ 60-30 14’ 0” STR-JZ 60-20 14’ 0” STR-JZ 45-20

Pagina 7

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 8. FOCUS SHIELD REFLECTOR INSTALLATION The focus shield reflector system can be adjusted to eithe

Pagina 8

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 12 FIGURE 12 HANGER ARRANGEMENTS 1 1 NOTE: Except for the vent end plate hanger, all hangers

Pagina 9

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 13 FIGURE 13 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) Using “S” Hooks attach

Pagina 10 - RD: NOV 2006

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 14 9. FLUE VENTING THIS STR-JZ SERIES IS APPROVED FOR DIRECT VENTING APPLICATIONS. THE SYSTE

Pagina 11

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 15 The heater is designed to operate with single wall 4” diameter 26 gauge minimum exhaust v

Pagina 12

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA NOTICE: Schwank Inc. reserves the right to make changes to equipment and specifications without o

Pagina 13

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 16 Where the vent pipe passes through areas where the ambient temperature is likely to produc

Pagina 14

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 17 Do not install filters on the combustion air intake. For ease of installation, this heater

Pagina 15

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA DO NOT use pressures greater than 1/2 psig. to pressure check the heater. TEST FOR LEAKS: All g

Pagina 16 - Page 12

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 12. HEATER EXPANSION Page 19 Tube Length in Feet Btu/hr input rating Approximate Overall expansio

Pagina 17 - Reflectors

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 20 MODEL NO STD ORIFICE (DMS) FOR USE AT ALTITUDES ABOVE (FEET) 2000 3000 4000 5000 600

Pagina 18 - DIRECT VENTED APPLICATION

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 21 15. LIGHTING INSTRUCTIONS Refer to the lighting instructions on the outside cover of the b

Pagina 19

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 22 The S87 is powered by a 25v transformer and activated when the thermostat calls for heat.

Pagina 20 - Page 16

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 23 STR-JZ SERIES: WIRING DIAGRAM - HONEYWELL S87J1034 Caution: Label All Wires Prior To Di

Pagina 21 - CAUTION:

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 24 18. STR-JZ SERIES: TROUBLESHOOTING GUIDE HONEYWELL S87J1034 120V THERMOSTAT APPLY

Pagina 22

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 25 MAIN BURNER LIGHTS SPARK STOPS WHEN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS

Pagina 23

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA STR-JZ GARAGE & WORK SHOP INFRA-RED GAS TUBE HEATERS TABLE OF CONTENTS TOPIC

Pagina 24 - Page 20

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 26 19. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides spark

Pagina 25 - NOTE:

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 21. START-UP SHEET Page 27 LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit i

Pagina 26

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 28 COMMISSIONING REPORT CONTRACTOR NAME: ...

Pagina 27

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 29 TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH AL

Pagina 28

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 30 21. OPTIONAL COMPONENTS Flue Vent Terminals 4” wall horizontal 6” wall horizontal JA-05

Pagina 29

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 31 90 degree Aluminized Steel Elbow Kit* *Kit includes: elbow, coupler, reflector and plate

Pagina 30 - CAUTION

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 32 #8 Hanging Chain - (box of 50 ft) JL-0798-JC Touch Up Paint - High Temp, 369g aerosol

Pagina 31 - 21. START-UP SHEET

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: STS-JZ / IQ, STV-

Pagina 32 - Page 28

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA ! ! WARNING: a. Due to high temperatures, the appliance should be located out of traffic an

Pagina 33 - Page 29

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 1 SCHWANK GAS INFRA-RED TUBE HEATER STR-JZ SERIES INSTALLATION INSTRUCTIONS Installation of t

Pagina 34 - Page 30

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 2 3. PRE-INSTALLATION SURVEY The Schwank STR-JZ heating system must have gas piping

Pagina 35 - Page 31

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA Page 3 TABLE 2 MINIMUM CLEARANCES TO COMBUSTIBLES** MODEL SUSPENDED AT AN ANGLE UP TO 45 DEGREES

Pagina 36 - Page 32

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA IMPORTANT: Continuous operation of single or multi-heater placement

Pagina 37 - March 2006

SP-MSJR-BX-08C STR-JZ Manual RD: NOV 2006 RL: 8C BA 1) Survey the available structural supports, considering the system configuration and heat re-qui